Road construction process

Road construction process

Thursday, October 3, 2019

Road construction process

A commonly used setting out procedure is the profile board method. A series of boards that show the exact level 1 meter above the completed construction level are placed at intervals along the proposed line of the road. A profile board with a fixed height, called the traveler, is used for controlling the excavated levels between these profile boards. By placing the traveler in the sight-line between two level boards, it can be seen whether or not the excavation has been carried out to correct levels and adjusted accordingly.